PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Grouting steel plates Pic -1(800x600).jpg Grouting steel plates Pic -2(800x600).jpg Grouting steel plates Pic -5 (800x600).jpg Installing the shear wall panels at Stair -4 (3rd Floor) Facing South-East (800x600).jpg Tying the reabr masts at Elev. 4-Stair -2 (4th Floor)  Facing South (800x600).jpg Underground storm piping Facing North-East(800x600).jpg Underground storm piping Facing West (800x600).jpg Compacting the underground piping at Rahway Ave. Facing the Administration Building (800x600).jpg Excavating at Rahway Ave. across the New Building (800x600).jpg
Previous pageNext page Tying the reabr masts at Elev. 4-Stair -2 (4th Floor)  Facing South (800x600)
Tying the reabr masts at Elev. 4-Stair -2 (4th Floor) Facing South (800x600)